Air International 2015-09
-
N.Pittaway - Poseidon Progress /Military/
P-8 output will shortly increase to around one and a half aircraft per month as Boeing moves from Low Rate Initial Production to Full Rate Production.
A Naval Aircrewman unloads a sonobuoy from the rack onboard a P-8A Poseidon.
Crew members’ mission workstations are located on the left-hand side of the cabin.
The infrared picture of a ship provided by the Wescam MX-20HD during the training mission before CARAT.
Летчики «Посейдона» на своих рабочих местах
The P-8A’s cockpit resembles the 737 Next Generation’s, but it has an additional screen for tactical information and controls for the additional electronic equipment and air-to-air refuelling.